Saturday, October 17, 2015

Army Corps Comments Due Soon

The Army Corps of Engineers wants to hear from you!

As previously reported (see Riverbend Pursues Wetlands Permit below), the Corps is reviewing a plan filed by Waste Management that would allow dump operators to build a new access road by rerouting the infamous No-Name stream into a 200-foot culvert.  

This creek, which is just south of Riverbend Landfill's Trash Mountain, was historically fish-bearing, providing migrating salmon with resting pools and spawning grounds.  In recent years, the stream has been degraded by culverts installed beneath Highway 18 and by Waste Management and its predecessors.  Waste Management claims the plans it submitted to the Army Corps will "enhance" the stream, but that's hard to imagine as the water plunges into a 200-foot-long culvert just feet after emerging from under Highway 18.

Moreover, the Landfill's plans completely ignore the impact that the Cascadia Subduction Zone earthquake will inevitably have on the landfill and the flood plain it sits in.  This quake is already overdue, yet Waste Management continues to promise that the landfill will not be affected -- despite evidence that the existing garbage dump was engineered, at best, for only a 7.25 magnitude quake.  The Big One will be magnitude 9.0 at least.

The comment period for the Army Corps has been extended to October 22 -- that's next Thursday.  Comments should be submitted to both the Army Corps and DEQ.  Contact kinsey.m.friesen@usace.army.mil and 401publiccomments@deq.state.or.us to tell them how you feel!

Professional surveyor Leonard Rydell, who knows more about the landfill than most of us, has drafted a model comment for you to use or to modify in your own words.  The important thing is to speak out!

Leonard's model comment:

Subject:  US Army Corps of Engineers No: NWP-2015-322
Oregon Department of State Lands No: 07-0733

Dear Army Corps of Engineers, Oregon Department of Environmental Quality, and Oregon Department of State Lands:

We, the undersigned, are writing to request that the Army Corps of Engineers, the Oregon Department of Environmental Quality, and the Oregon Department of State Lands deny Riverbend Landfill’'s Permit Application No's NWP-2015-322 and DSL 07-733.

Riverbend Landfill is the WORST POSSIBLE PLACE in the Willamette Valley to construct and expand a landfill.  The site is located in and next to the bottom lands of the South Yamhill River and is subject to meandering river channels.  The landfill is situated on liquefiable soils in wetlands, a formerly-designated floodway, and an existing flood plain, in a wet climate that receives 41 inches of rainfall a year, within the Cascadia Subduction Zone that historically has been subject to earthquakes with magnitudes up to 9.09.  A CSZ earthquake is overdue, and the existing landfill is not engineered to withstand a subduction quake of anything close to this magnitude.  In addition, flood waters annually lap up to the existing and proposed landfill berms at the edge of the re-mapped floodway.

The expanded landfill will be 156 to 166 feet high with the toe of the support berms in the flood plain.  After an earthquake, Riverbend’'s leachate will have only a few feet to flow to end up in the waters of the South Yamhill River.  Already last year, before expansion, 32 million gallons of toxic leachate were hauled from Riverbend Landfill to treatment plants outside of Yamhill County.

This expansion risk is unacceptable to the health and safety of our environment and watershed.  Please deny the permit.

Thank you.